Aluminum Smelter Demolition and Asset Recovery
Site Overview
The smelter facility was used for aluminum reduction from 1940 into the late 1990s and required total dismantlement once operations ceased under a tight schedule for an impending property sale. Envirocon provided comprehensive facility demolition, soil remediation, waste management, and asset recovery services at the site.
Project Highlights
- Identified and removed all hazardous materials including spent potliner (K088) waste containing high concentrations of cyanide, asbestos containing material (ACM), and universal wastes prior to demolition
- Dismantled and processed cells and residual materials within for disposal or salvage/recycling
- Safely demolished over 70 total structures and 1 million square feet of facilities using a combination of controlled felling, crane picks, and explosive means
- Managed all demolition debris and materials as potential assets and salvaged or recycled over 29,000 tons of metals and more than 200,000 tons of asphalt, brick, and concrete
- Delivered the project safely, on schedule, and on budget, despite last-minute plan revisions to ensure that the client’s ore unloading operations remained active during demolition
Value Delivered
29k+
Tons Of Ferrous & Non-Ferrous Metals Recycled
800
Tons Of Aluminum Recycled
200k
Tons Of Asphalt, Brick, & Concrete Recycled